As we identify customer and supplier requirements for a SIPOC we are urged to use the RUMBA approach which stands for Reasonable, Understandable, _____________, Believable and Achievable.
A. Manageable
B. Massive
C. Memorable
D. Measurable
One of the primary benefits of your team working together to create an X-Y Diagram is that the data collected from this exercise is accurate and certain.
A. True
B. False
Measurement System Analysis is a procedure used to quantify variation of the method or system used for taking measurements and used to assure usable data is collected.
A. True
B. False
A Belt gathered the following defect data for a trouser production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data: Cutting 29
Forming 43
Stitching 17
Sealing 51
A. Sealing, Forming, Cutting, Stitching
B. Cutting, Stitching, Sealing, Forming
C. Stitching, Forming, Cutting, Sealing
D. Forming, Cutting, Sealing, Stitching
Y, the output of a process, is the ______________ variable while Xn, the various inputs to a process, are the _____________ variables.
A. Independent, dependent
B. Individual, multiple
C. Sole, multiple
D. Dependent, independent
SIPOC stands for Suppliers, Inputs, ___________ , Output and Customers.
A. Production
B. Process
C. Products
D. Presentation
Lean Principles defines for us seven specific areas where ________ typically exists in our processes.
A. Waste
B. Excess inventory
C. Variation
D. Data error
Which best describes the purpose of Six Sigma?
A. Reduce Value Added Steps
B. Reduce Variation in processes
C. Reduce Non-Value Added Steps
D. Reduce customer requirements
When completing an FMEA what are standard process controls that are typically used to prevent a failure in a process?
A. Statistical Process Control, Poke-Yoke, Inspection
B. Checksheets, Customer Interviews, Surveys
C. Customer Complaints, Inspections, Error Proof
D. Statistical Process Control, tracking defects in process
One method of implementing control to the critical phase of a process is to automate the stoppage of the process if a key metric goes out of specification.
This control tool is called ___________________.
A. Process Interruption
B. Poka-Yoke
C. Spec Stop
D. Flow Protection