You are installing a rack at customer site.
How can you ensure redundant power to the rack?
A. Install two power distribution units (PDUs) with each one connected to a power socket supplied by an independent electrical power source.
B. Ensure 3-phase power is available in the data center.
C. Connect an uninterruptible power supply (UPS) to redundant circuit breakers at the facility power source.
D. Use two different power cords to connect the server to the power grid at the customer site.
A customer wants to decrease problem resolution time on their HPE infrastructure. Why would this customer benefit from Insight Remote Support?
A. It provides event diagnosis and automatic, secure submission of hardware event notifications to HPE.
B. It provides health monitoring and alerting and suggests resolutions for common issues.
C. It monitors 1600 system parameters and applies analytics to predict problems before they can lead to system or component failure.
D. It maintains an up-to-date change log by recording hardware and system changes in real-time.
You are configuring an internal Smart Array controller on an HPE ProLiant server. Which statement is true regarding the drives in the logical array?
A. HDDs and SSDs cannot be mixed in the same logical array.
B. SATA HDDs and SAS SSDs can be mixed in the same logical array.
C. SAS HDDs and SATA HDDs can be mixed in the same logical array.
D. SATA SSDs and SATA HDDs can be mixed in the same logical array.
You are installing HPE ProLiant servers into a rack that will be fully loaded. You also need to install four power distribution units (PDUs) in the rack. How should you install the PDUs to maximize power distribution and space efficiency?
A. at the top of the rack with the cables running between the RETMA rails
B. horizontally on extension bars mounted directly to the frame for improved clearance
C. in the bottom bay of the rack with the outlets facing the front
D. vertically, side by side on both sides of the rack with the outlets facing the center
You are installing an HPE ProLiant server that has a shared network port for iLO and NIC teaming. You need to ensure that you can still access iLO after configuring the NIC team. Which teaming technology should you configure?
A. round robin
B. switch-assisted load balancing
C. receive load balancing
D. network fault tolerance
What should you install with a server for a customer who may need to perform maintenance on the server while it is the rack? (Select two.)
A. Cable Management Arm (CMA)
B. redundant PDUs
C. high performance fan kit
D. rack stabilization kit
E. blanking panels
You are troubleshooting an HPE ProLiant rack-mount server. You need to collect event data from the server, even when it is not operational. Which tool should you use?
A. Insight Online
B. InfoSight
C. OS Event Viewer
D. Integrated Management Log
You need to install 10 HPE ProLiant servers in an environment without DHCP. Which tool can you use to set up remote management?
A. Intelligent Provisioning
B. UEFI System Utilities
C. Intelligent Management Center
D. iLO 5 Configuration Utility
A customer requires a storage platform for their department data. They have a limited budget and will be sharing files among their Microsoft Windows environment. Which HPE storage platform meets the customer's needs?
A. Nimble
B. StoreOnce
C. 3PAR StoreServ
D. StoreEasy
A customer requires a high level of network bandwidth and reliability. You are installing a pair of HPE switches that can provide redundancy with multiple connections between them for high availability and faster throughput. Which technology should you configure on the switches to enable the capability the customer requires?
A. Rapid Spanning Tree Protocol (RSTP)
B. Virtual Extensible Local Area Network (VxLAN)
C. Multichassis Link Aggregation (MLAG)
D. Multiple Spanning Tree Protocol (MSTP)