HOTSPOT
A customer needs to incorporate the HPE Synergy D3940 Composable Storage Module into its environment. Click the adapter associated with the fabric in which the customer should install the P542 controller.
Hot Area:

DRAG DROP
Use the arrow or click and drag the steps on the left to set up a new HPE Synergy 12000 Frame into the correct order on the right.
Select and Place:

A customer has HPE Synergy SY 480 compute modules with two CPUs and 384GB (16GB DIMMS) of memory. The customer needs to double the CPU and memory capacity for a Java application server. What should a Synergy integrator do to meet the customer's need?
A. Install an HPE Synergy SY 620 compute module and reassign the server profile.
B. Upgrade the HPE Synergy SY 480 to two additional CPUs and replace 16Gb dims with 64Gb.
C. Install an HPE Synergy SY 680 compute module and reassign the server profile.
D. Upgrade the HPE Synergy SY 480 to two additional CPUs and replace 16Gb dims with 32Gb.
How can a Synergy integrator increase the efficiency with which a Synergy solution can be provisioned? (Choose two.)
A. Use Powershell to automate configuration and application of server profiles.
B. Use Image Streamer to provide a stateless OS environment.
C. Associate all Synergy frames with the same data center.
D. Use a Multimodule Link Aggregation Group (MLAG) to automate link failover.
E. Use Composer as a PXE server to automate OS deployments.
A Synergy integrator has planned a highly available Synergy composable fabric with 20Gb Interconnect Link Modules. What is the maximum number of SY 480 Gen9 compute modules the integrator can install into this configuration?
A. 12
B. 24
C. 36
D. 48
A customer has a single frame with seven compute modules in bays 1-7. The customer also has an HPE Synergy 12Gb SAS Connection Module in slot 1. The customer recently made a change to require high availability for its storage. What should the Synergy integrator do to meet the customer's requirement for high availability?
A. Install an additional HPE D3940 storage module to support bays 7-12.
B. Move the compute module from bay 7 to bay 12.
C. Add another HPE Synergy 12Gb SAS Connection Module to bay 4.
D. Move the mezzanine Card to slot 2 on each compute module.
In a 3-frame HPE Synergy environment, how should a Synergy integrator place the Image Streamer modules to allow for redundancy to all of the management connections?
A. one Image Streamer module in each Synergy frame (3 total)
B. one Image Streamer module in frame 2 and a second Image Streamer Module in frame 3 (2 total)
C. two Image Streamer modules in the frame 1 (2 total)
D. two Image Streamer modules in frame 2 and two Image Streamer Module in frame 3 (4 total)
A customer has purchased 15 Synergy Frames with the following components:
150 HPE SY 480 compute modules
15 HPE Synergy D3940 storage modules with 40 disks each
6 Image Streamers
6 Virtual Connect SE 40Gb F8 modules
24 10Gb Interconnect Link Modules
How many frames can the configuration have for the Logical Enclosure?
A. 3 frames
B. 4 frames
C. 5 frames
D. 6 frames
A customer needs increased available bandwidth and highly available network Virtual Connect interconnects.
Which two steps must the Synergy integrator perform in the configuration to meet the customer's needs? (Choose two.)
A. Link Ports L1 and L4 on Master ICMs to ports L1 and L2 on the first Satellite ICM.
B. Install Redundant Frame Link Modules and a second management ring.
C. Enable Multimodule Link Aggregation Group (MLAG).
D. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules.
E. Connect Ports Q7 and Q8 on the Master Interconnect Modules (ICM).
A Synergy integrator needs to add more NICs to a server profile.
What does the integrator need to be aware of when performing this action?
A. The host needs to be powered off to activate the change.
B. The Virtual Connect modules need to be rebooted once the profile is applied.
C. The server profile template must be changed before modifying the server profile.
D. The host networks will go offline when the profile is assigned.