Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
A. Keep archiving on during the whole procedure.
B. Use the Near Zero Downtime Maintenance Technology (NZDM).
C. Reuse a profile for the shadow instance from a previous run.
D. Choose the instance number of the shadow instance.
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
A. The source system is non-Unicode and the target database is a scale-out system.
B. The target database size increases temporarily because of the Shadow Repository.
C. SAP HANA Landscape Reorganization required a manual step to edit a file.
D. Network capacity between exporting and importing R3load processes must be.
E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
A. The path was stored in file host_profile during registration
B. The path was stored to the environment of user
C. The path is taken from the URL entered in the browser to start SUM
D. The path was stored in file sumabap conf during registration
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
A. After SUM has ended
B. During the Execution roadmap step
C. Before the start of the SUM technical downtime
D. During the SUM technical downtime
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
A. 750
B. 700
C. 731
D. 740
In ICNV. How database operations synchronized between the source and the target table?
A. Deletes are directly executed in the target table by delete trigger.
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
A. It contains a troubleshooting section
B. It is target release specific
C. It contains a section "free space requirements"
D. It is a database-specific document
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
A. Create "modified* versions of the objects that you need to adjust
B. Release the transport request containing the modification adjustment
C. Assign the transport request as a modification adjustment transport
D. Manually activate the adjusted dictionary objects
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
A. Uptime migration (EU_CLONE_MIG_UT_RUN)
B. ParaUel distribution (PARDIST_SHD)
C. Downtime migration (EU_CLONE_MIG_DT_RUN)
D. Shadow repository creation (EU_IMPORT*)
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
C. In the job log for the corresponding job in SM37 (Job Overview)
D. In the corresponding R3trans log files of this phase