When adding a VxRail node the validation fails. What could be the cause of this problem?
A. IPv6 multicasting is not enabled
B. Only one network interface online
C. Time on the node was not set correctly
D. DNS record was not created
What is the maximum number of hosts supported in a VxRail Stretched Cluster?
A. 15
B. 16
C. 31
D. 32
Which requirement is optional for a VxRail Stretched Cluster?
A. Enterprise Plus vSphere Licensing
B. External vCenter
C. IPv6 Multicast between locations
D. Cross-site layer-2 connectivity
What accurately describes the positioning of a VxRail?
A. Can start small and grow with a low entry cost
B. Software defined solution with rack scale and integrated networking
C. Can start small and grow to hundreds of nodes
D. Converged architecture with enterprise grade resiliency
The Market Place on a VxRail Manager is empty on a newly deployed system. Testing shows that the Internet is reachable through proxy in the management network. Which action should be taken to correct this situation?
A. VxRail Manager has no proxy support.
B. Upgrade tolatest version and add proxy configuration manually.
C. Manually add the proxy information in the VxRail Manager configuration
D. Reset the appliance and redeploy with proxy information filled in the deployment process.
A company has chosen to deploy an external vCenter/PSC. They would like to use the bundled vCenter
license that comes with VxRail.
What is the correct procedure to do this?
A. Contact EMC Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.
B. Contact VMware Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.
C. Log into VxRail Manager through SSH and extract the vCenter license key from the application properties file.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.
D. Bundled vCenter license is only valid when vCenter is internally deployed. The company must provide their own vCenter license.
A workstation is being configured on the management VLAN (10.150.140.0/24) to connect to VxRail Manager for first time deployment. Configuring which IP addresses on the workstation will result in a successful deployment without having to change them during initialization?
A. 192.168.1.199 and 10.150.140.100
B. 192.168.1.250 and 10.150.140.255
C. 192.168.10.199 and 10.150.140.255
D. 192.168.10.250 and 10.150.140.250
Which network traffic types require the specification of a VLAN ID in the VxRail Pre- Installation Site Checklist?
A. Fault Tolerance, vMotion, vSAN, and user VM Network
B. Management, vMotion, and vSAN only
C. Management, vMotion, vSAN, and user VM Network
D. vMotion, vSAN, and user VM Network only
During the deployment of VxRail, you import a JSON file and attempt a validation. An error indicates that node 1 cannot access the other nodes. When you look at the Nexus switchport configuration, you see the following on all VxRail ports: interface TenGigabitEthernet 1/x switchport switchport trunk switchport trunk allow vlan all What is a possible reason for this situation?
A. "switchport trunk native vlan x" is notconfigured
B. "switchport access vlan x" is not configured
C. "switchport trunk vlan x" is not configured
D. "switchport vlan x" is not configured
Which vSAN features are specific to an all-flash model VxRail?
A. Erasure Coding and Stretch Clustering
B. Thin Swap Objects and Stretch Clustering
C. Deduplication/Compression and Thin Swap Objects
D. Deduplication/Compression and Erasure Coding