What are the names of the objects for process integration of production orders? (Choose two)

A. Control recipes

B. Work instructions

C. PI sheets

D. Control instructions

Buy Now
Questions 5

Which data forms the basis for calculating the capacity requirement for an operation? (Choose three.)

A. Standard values (routing)

B. In-house production time (material master)

C. Transport time (routing)

D. Formulas (work center)

E. Operation control key (routing)

Buy Now
Questions 6

Which of the following scheduling types can only be used in capacity planning?

A. Midpoint

B. Forward

C. Only capacity requirements

D. Backward

Buy Now
Questions 7

Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)

A. The order and its operations receive the system status Locked (LKD).

B. Reservations are deleted.

C. Purchase orders for external operations or non-stock materials are deleted.

D. The order is no longer relevant for Material Requirements Planning.

E. Capacity requirements are deleted.

Buy Now
Questions 8

During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.

Which of the following procurement type properties are valid? (Choose two)

A. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production.

B. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.

C. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.

D. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.

Buy Now
Questions 9

Which of the following master data is necessary for the creation of material reservations for production orders?

A. Material master records

B. Production/resource tools

C. Routings

D. Production versions

Buy Now
Questions 10

Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?

A. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.

B. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.

C. Assign an appropriate availability checking rule to the material master for the product.

D. Activate the availability check and assign an overall profile in the production scheduling profile.

Buy Now
Questions 11

What is a feature of the simu-lation mode for material requirements planning in SAP ECC?

A. It calculates the delay time which may occur in planning.

B. It triggers multilevel bottom-up scheduling.

C. It propagates exception messages from a component to the finished product.

D. It posts planning results to the database automatically.

Buy Now
Questions 12

In which scenario will the error message shown in the attached screenshot occur?

Exhibit:

Exhibit

A. A valid routing exists, but the material master is set to manual routing selection.

B. A valid routing exists, but the Customizing for the order type is set to manual routing selection.

C. The routing is not valid at the explosion date.

D. The selection method is set to "selection only by production version" in the material master.

Buy Now
Questions 13

What can you use to organize material staging for production orders? (Choose three)

A. Material documents

B. Transfer orders

C. KANBAN

D. Pull list

E. Logistics Information System (LIS)

Buy Now
Exam Code: C_TSCM42_67
Exam Name: SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
Last Update: Jul 03, 2026
Questions: 106
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99