What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes
What does SAP ERP mean?
A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
A. Planning with make-to-stock (strategy 10)
B. Planning with final assembly (strategy 40)
C. Planning at the assembly level (strategy 70)
D. Planning without final assembly (strategy 50)
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon. What procedure do you recommend for setting the planning horizon?
A. Set the planning horizon in the MRP groups in Customizing and assign variant entries via the plant parameter settings.
B. Set the planning horizon in Customizing using the plant parameter settings and assign variant entries via the MRP groups for the corresponding materials.
C. Set the planning horizon in the MRP groups in Customizing and store the variant values in the material masters for the corresponding materials.
D. Set the planning horizon in the plant parameters in Customizing and store variant entries in the material masters for corresponding materials.
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
A. Finite capacity scheduling
B. Setup time reduction
C. Midpoint scheduling
D. Lot size optimization
E. Batch size optimization
Where can you define the default storage location for the material component of a production order? (Choose three)
A. Material master (component)
B. Routing
C. Production supply area of a work center
D. Production version (product)
E. BOM header (product)
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
A. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.
B. Requirements planning considers only changes that are relevant for scheduling within the planning time fence.
C. The MRP controller cannot create planned orders within the planning time fence.
D. Planned orders are created within the planning time fence and automatically firmed by requirements planning.
In which scenario will the error message shown in the attached screenshot occur?
A. The selection method is set to "selection only by production version" in the material master.
B. The routing is not valid at the explosion date.
C. The Customizing for the order type is set to manual routing selection and a valid routing exists.
D. The material master is set to manual routing selection and a valid routing exists.
Which of the following efforts can be minimized using the KANBAN procedure?
A. Effort for Sales and Operations Planning (SOP)
B. Organizational effort for material staging
C. Effort for master data maintenance
D. Organizational effort for capacity planning
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
Which of the following statements are true for the two lists at this stage? (Choose two)
A. The MRP list displays the production order.
B. The stock/requirements list displays the production order.
C. The stock/requirements list was updated at the precise time it was accessed.
D. The MRP list has the status "processed".