Which attribute is used to assign a work item to a team area?
A. owner
B. category
C. component
D. stream
How do you make use of a process template?
A. By adding the team members to the process template
B. By specifying the process template when you create a project area.
C. By associating a process template to the current iteration.
D. By creating a process template category for the project
What does the filled-in shape icon shown below indicate in Team Artifacts view?

A. Files in that component have been checked out.
B. All files from that component have been loaded into a local sandbox.
C. There are incoming changes in that component.
D. There are outgoing changes in that component.
A team wants to benefit from synchronous collaboration by using instant messaging. Which statement is true about Rational Team Concert support for instant messaging?
A. Rational Team Concert does not integrate with instant messaging tools.
B. Teams can use chat features only if they are using the IBM Sametime instant messaging product.
C. Rational Team Concert provides instant messaging capabilities, and no other tool is needed to initiate chats.
D. Teams members can initiate chats when they configured Rational Team Concert to integrate with an instant messaging tool
What is a function of a snapshot?
A. to create a picture file of a specific work item in an iteration plan
B. to capture the state of all the components in a stream or workspace
C. to lock a set of files in a repository workspace and provide isolation
D. to track the flow targets for a repository workspace to another workspace
Which three automated notification methods are used to inform users that a work item has been changed? (Choose three.)
A. email
B. font color in the work item
C. events feed
D. instant message
E. pop-up in the Eclipse client
What are two purposes of work item categories? (Choose two.)
A. to determine which team member owns the work item
B. to determine which team owns the work item
C. to classify a work item according to functional area or team
D. to define the priority and the completion date of the work item
Which three Rational Team Concert user interfaces allow users to request and view build results? (Choose three.)
A. Eclipse client
B. Visual Studio client
C. web client
D. command line
E. Customer Information Control System
What does the permission indicated below in the Team Configuration of a Project Area Editor allow role members to do? Team Configuration-> Source Control->Replicate change sets- >replicate

A. replicate change sets to another user's workspace
B. deliver changes to a flow target on a different RTC server
C. deliver automatically all the changes made in a workspace
D. replicate the profile of a user on another RTC server
What is the main purpose of the work item discussion section?
A. to add notes and exchange information about the work item
B. to assign the owner of the work item
C. to move the work item through its lifecycle to the resolved state
D. to associate a work item with a release