Leads4pass > Avaya > Avaya Certifications > 3605 > 3605 Online Practice Questions and Answers

3605 Online Practice Questions and Answers

Questions 4

OSPF computes the shortest path to destination subnets, whereas, IS-IS, as used with SPBM works differently. Which parameter does IS-IS use to compute the path?

A. Customer MACs

B. Backbone MGIDs

C. VLAN MAC IDs

D. Backbone nodal MAC addresses

Buy Now
Questions 5

A switch with Simple Loop Prevention Protocol (SLPP) did not detect a loop. What are two reasons this occurred? (Choose two.)

A. SLPP was not globally enabled.

B. A premier license for SLPP is needed.

C. SLPP was not enabled on the VLAN where the loop originated.

D. Extended CP limit on the transmitting port was not configured.

Buy Now
Questions 6

A technician is configuring 802.1Q tagging, Virtual Link Aggregation Control Protocol (VLACP) with short timeout, and untagged frames to be discarded. Which part of the network is being configured?

A. IST

B. The out-of-band management port

C. The edge access ports

D. The uplinks

Buy Now
Questions 7

The goal of the Converged Campus architecture is to provide a highly reliable infrastructure with subscribed failover preventing any interruption of traffic on the network? What are the two primary benefits of this design goal? (Choose two)

A. In the event of a failure, no less of connectivity or application availability will be experienced by the end user.

B. This architecture provides high performance Layer 3 switching, resiliency, security, and services.

C. This design goal provides numerous connectivity options including Asynchronous Transfer Mode (ATM), Packet over SONET (POS), and 10 Gigabit Ethernet.

D. The design goal provides the ability to provide hitless software upgrade for the core of the network.

Buy Now
Questions 8

Config mlt 1 create name "MLT to Core" Config rmlt 1 add ports 3/8, 4/8 Config mlt 1 add vlan 1 Config mlt 1 perform-tagging enable ho mlt info 1

To add more links to this MLT setup at a later date, what needs to be provisioned?

A. Create a new VLAN and add the new VLAN to the MLT.

B. More ports cannot be added because only a total of two can be aggregated to the core device.

C. once the MLT is enabled and working, more ports cannot be added to the link aggregation

D. Associate the new ports to the same settings as the current MLT ports; then add them to the MLT.

Buy Now
Questions 9

An Ethernet Routing Switch (ERS) 8600 for Virtual Router Redundancy Protocol (VRRP) is being configured. Which CU command would cause this switch to be the VRRP master?

A. ERS8600:5# config vlan 100 ip vrrp 100 priority 250

B. ERS8600:5ff config vlan l00 ip vrrp 100 priority 1

C. ERS860Q:5# config vlan 100 ip vrrp 100 master

D. ERS8600:5# config vlan 100 ip vrrp 100 priority master

Buy Now
Questions 10

The attempt to manage an Ethernet Routing Switch (ERS) 8600 using a VRRP address was unsuccessful. What is causing this problem?

A. The fie virtual router identifier is 0.

B. The datacenter interface is set as a critical IP interface.

C. A real IP address is required for management access not a VRRP address.

D. The incorrect MAC offset is configured for the VRRP address.

Buy Now
Questions 11

A technician is configuring the core of a Converged Campus network, and is adding a backup-master configuration to an existing Virtual Router Redundancy

Protocol (VRRP) configuration for a VLAN that extends to the edge switches.

Which benefit is expected from the Addition of backup-master?

A. reduced traffic on the IST

B. reduced traffic on the uplink ports

C. redundant default gateways for host devices

D. faster switchover time

Buy Now
Questions 12

Which command mode contains the commands needed to work on software licenses?

A. User Exec

B. Privileged Exec

C. Global Configuration

D. Software Configuration

Buy Now
Questions 13

The edge has been configured; the core configuration can be verified. Which configuration is the last step in the verification process?

A. MLT configuration check

B. Ext CP limit configuration check

C. SLPP configuration check

D. VLACP configuration check

Buy Now
Exam Code: 3605
Exam Name: Avaya Ethernet Routing Switch Implementation and Maintenance Exam
Last Update: Jul 05, 2026
Questions: 173
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99