Leads4pass > Oracle > Oracle Certifications > 1Z0-996-22 > 1Z0-996-22 Online Practice Questions and Answers

1Z0-996-22 Online Practice Questions and Answers

Questions 4

Critical validation rules verify the integrity of the initial measurement data (IMD). If an implementation needs to add new critical validations, where would you configure them?

A. as new lifecycle algorithms on the IMD Seeder BO (D1-IMDSeeder)

B. in the pre-processing algorithm of the IMD Seeder BO (Dl-IMDSeeder)

C. as options on the IMD Seeder BO (D1-IMDSeeder)

D. in the schema of the IMD Seeder BO (D1-IMDSeeder)

E. in the validation algorithm on the IMD Seeder BO (D1-IMDSeeder)

Buy Now
Questions 5

What Service Order activity types does the application include?

A. Start Service; Stop Service; Cut for Non-Payment; Reconnect Service for Payment; Exchange Meter; Move-In/Move-Out Service

B. Start Service; Stop Service; Install Meter; Remove Meter; Exchange Meter; Move-In/Move-Out Service

C. Enable Service; Disable Service; Install Meter; Remove Meter; Exchange Meter; Back-to-Back Service

D. Enable Service; Disable Service; Cut for Non-Payment; Reconnect Service for Payment; Exchange Meter; Back-to-Back Service

Buy Now
Questions 6

How do you ensure that specific Validation, Editing, and Estimation (VEE) rules are applied to estimated measurements?

A. by adding the VEE Group to the Device Configuration Type

B. by adding the estimation rules to the Manual Override VEE Group to the Measuring Component Type

C. by adding the VEE Group to the Device Type

D. by adding the VEE Group as the Fallback VEE Group for the appropriate VEE role

Buy Now
Questions 7

How many service agreements are linked to a severance process?

A. all service agreements that are connected to the initiating overdue process

B. one

C. any number defined by the business user

D. zero - accounts are linked to severance processes

E. all service agreements that are connected to the initiating collection process

Buy Now
Questions 8

Which statement correctly describes the relation between a device and a measuring component?

A. A device configuration links a device only to interval channels.

B. Two measuring components on the same device should have the same Units of Measure (UOM).

C. A device should have only one measuring component type.

D. A device can have any combination of interval and/or scalar measuring components.

Buy Now
Questions 9

What can cause a bill segment to have multiple bill calculation headers?

A. multiple Rate Version Calculation Group

B. multiple Scheduled Read Dates covered by the bill period

C. proration at Bill Factor level

D. multiple service agreements being covered by a bill segment

E. proration at Calculation Rules level

Buy Now
Questions 10

What can cause multiple bill lines for a rate component to be produced in a bill calculation header?

A. changes in Rate Schedule and Bill Factor

B. changes in Rate Version Calculation Group and Bill Factor

C. change in Bill Factor

D. change in Rate Version Calculation Group

E. change in Rate Schedule

Buy Now
Questions 11

Which three are important Account concepts that must always be followed? (Choose three.)

A. Accounts expire when there are no active contracts.

B. An Account can only reference one and only one person at one time.

C. Every Account has a unique, system-assigned Account ID.

D. Bills are produced for an account and are sent to the account persons.

E. An Account references one or more persons.

Buy Now
Questions 12

Your client has three requirements:

1.

Apply validations on meter reads coming from the Data Collectors.

2.

If a meter read does not pass the validation, an error will be generated and assigned to a user.

3.

Retry the validation every 30 minutes for the errors in case the issue is related to configuration. Which statement describes the base functions you should use?

A. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-COMP-TD (Complete To Do Entries).

B. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-IMD-RETRY (Retry Initial Measurement Data Processing)

C. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be loaded after 30 minutes.

D. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-CRE-IMDTD (Create To Do)

E. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be manually loaded.

Buy Now
Questions 13

A device has one or more measuring components that measure consumption, demand, or other values.

Which lists two attributes of a measuring component?

A. Channel Multiplier and Channel ID

B. Channel ID and Badge Number

C. Serial Number and Badge Number

D. Model and Serial Number

E. Manufacturer and Model

Buy Now
Exam Code: 1Z0-996-22
Exam Name: Oracle Utilities Customer Cloud Service 2022 Implementation Professional
Last Update: Jun 06, 2026
Questions: 70
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99