To reduce the subassembly stock with no impact on material planning of child components of the
subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.
A. Change the Supply Type = Push in Item definition and Work Definition, for subassemblies having high inventory stock.
B. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.
C. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
D. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day. Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.
C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-
house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated
creation of a Supply Order rather than Work Order.
Identify two options that can cause this situation.
A. Sourcing rules for the product item are defined as Make as well as Transfer.
B. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.
C. Sourcing rules for the product item are defined as Buy as well as Transfer.
D. Sourcing rule for the product item is defined as Buy.
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product. Which seeded job role must this employee be provided with?
A. Manufacturing Engineer
B. Production Engineer
C. Production Operator
D. Manufacturing Supervisor
E. Production Supervisor
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts. Determine the available capacity of the resource R1 for that week.
A. 78 hours
B. 76 hours
C. 60 hours
D. 70 hours
A user wants to transfer the work order status updates and resource transaction data for costed resources
to Cost Management.
Which scheduled process should you run to achieve this requirement?
A. Transfer Cost to Cost Management
B. Transfer Transactions to Costing
C. Transfer Ledger Balances
D. Transfer General Ledger Balances to Balance Cubes
You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used to accomplish this task?
A. Use the Mass Edit functionality.
B. Run the ESS process "Update Item Cost Estimate".
C. Enter cost estimates directly into UI.
D. Call web service.
E. Import spreadsheet.
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes. Which two reasons could cause this?
A. The engineer does not have Data access to Items Attributes.
B. The engineer does not have Data access to Items.
C. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
D. The engineer does not have Data access to Item Structures.
E. The engineer does not have the Manage Work Definitions function privilege.
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it. Identify the setup that will fulfill this requirement.
A. Select the Automatically Transact check box while defining the Standard Operation.
B. Deselect the Count Point check box while defining the Standard Operation.
C. Select the Count Point check box while defining the Standard Operation.
D. Ensure that the Charge Type of the resource is Automatic.
One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and
manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?
A. Work Area, Work Center, and Resources
B. Work Center and Resources
C. Resources and Components
D. Work Area, Work Center, Resources, and Components
E. Work Area, Work Center, Resources, Components, and Miscellaneous